Vesgantti Sectional Sleeper Sofas with Storage, 92" Sofa Bed with 6 Seats Storage Chaises Removable Cover, Deep Seat Modular Couches Velvet Couch Set for Living Room, Apartment, Home Theater, Gray

Vesgantti Sectional Sleeper Sofas with Storage, 92" Sofa Bed with 6 Seats Storage Chaises Removable Cover, Deep Seat Modular Couches Velvet Couch Set for Living Room, Apartment, Home Theater, Gray

$1,319.98
Sale price  $1,319.98 Regular price 
Skip to product information
Vesgantti Sectional Sleeper Sofas with Storage, 92" Sofa Bed with 6 Seats Storage Chaises Removable Cover, Deep Seat Modular Couches Velvet Couch Set for Living Room, Apartment, Home Theater, Gray

Vesgantti Sectional Sleeper Sofas with Storage, 92" Sofa Bed with 6 Seats Storage Chaises Removable Cover, Deep Seat Modular Couches Velvet Couch Set for Living Room, Apartment, Home Theater, Gray

$1,319.98
Sale price  $1,319.98 Regular price 
Shipping calculated at checkout.
Payment methods
  • PayPal
  • Venmo
Details

Product Details

  • Brand: Vesgantti
  • Color: Grey
  • Pattern: Solid
  • Size: 6 Seats-Sleeper Sofa
  • Item Dimensions: 54.3 x 91.7 x 26.8 inches
  • Item Weight: 78 Pounds
  • Included Components: 6 Seats, Back Pillow, Throw Pillow
  • Model Number: Velvet Exper
  • Manufacturer: Vesgantti
  • Shape: Sleeper Sofa
  • Item Dimensions D x W x H: 54.3"D x 91.7"W x 26.8"H
  • Leg Length: 2.76 Inches
  • Arm Height: 26.8 Inches
  • Arm Width: 5.5 Inches
  • Sofa Type: Sectional
  • Additional Features: Adjustable Armrest, Detachable Backrest, Leg Height Adjustable, Pet Friendly, Storage
  • Room Type: Bedroom, Home Office, Home Theater, Living Room, Playroom
  • Collection Name: Velvet Exper
  • Indoor Outdoor Usage: Indoor
  • Recommended Uses For Product: Residential
  • Included Throw Pillow Quantity: 2
  • Manufacturer Part Number: Velvet Exper
  • Item Type Name: Sectional Sofa Bed
  • Required Assembly: Yes
  • Recommended Number of People for Assembly: 2
  • Includes All Assembly Tools: Yes
  • Style Name: Modern
  • Arm Style: Adjustable, Curved
  • Back Style: Cushion Back
  • Leg Style: Height Adjustable
  • Accent Color: Grey
  • Weight Capacity Maximum: 1800 Pounds
  • Seating Capacity: 6
  • Item Firmness Description: Medium
  • Seat Cushion Configuration: Single Cushion Seat
  • Reclining Seat Count: 5
  • Reclining Position Count: 3 Position
  • Is Customizable?: No
  • Is Modular: Yes
  • Upholstery Fabric Type: Velvet
  • Frame Material Type: Wood
  • Material Type: High-density Foam, Metal, Wood
  • Product Care Instructions: Spot Clean with Damp Cloth
  • Seat Fill Material: Foam
  • Furniture Leg Material: Plastic, Wood
  • Seat Back Fill Material: Foam
  • Fill Material: High Density Foam
  • Material Features: Natural
  • Included Throw Pillow Cover Material: Foam
  • Cushion Construction: Foam

About this item

  • MODULAR SPACE-SAVING SECTIONAL SOFA – The Vesgantti modular sofa features a full modular design with a clean modern aesthetic, ideal for apartments, condos, studios, offices, basements, and family rooms. It can be freely reconfigured into a living room couch, sofa bed, U-shaped sectional, or corner sofa to fit different layouts and lifestyles. Overall dimensions: 91.7"W x 59.8"L x 26.8"H, making it a versatile centerpiece for small to medium living spaces
  • CUSTOMIZABLE COMFORT WITH ADJUSTABLE ERGONOMICS – Vesgantti sleeper sofa is engineered for personalized comfort, featuring a generous 27–54 inch adjustable seat depth with soft cushions and high-density memory foam for ergonomic support. Human-centered design allows the backrest and armrest to be adjusted to multiple angles, offering flexible lounging, sitting, and reclining positions. Designed for everyday comfort in small-space living without compromising support
  • HIDDEN STORAGE DESIGN FOR SPACE EFFICIENCY – Practicality is enhanced with built-in storage compartments under each seat and ottoman, helping maximize space in compact homes. Each compartment measures 23.4"L x 23.4"W x 6.7"H and includes a detachable partition with wide-opening access, making it easy to store and organize blankets, pillows, clothing, toys, and daily essentials while keeping your living space clutter-free
  • MODULAR EASY ASSEMBLY & FLEXIBLE CONFIGURATION – The deep seat modular sectional sofa features a modular design for simple assembly and flexible reconfiguration to fit your space needs. The sofa arrives in 5 packages (may arrive separately) with all necessary tools and clear instructions included for setup in about one hour. Two leg height options (2.76" & 4.72") allow you to create a low modern profile or extra clearance for convenient robot vacuum cleaning
  • DURABLE CONSTRUCTION & PREMIUM PET-FRIENDLY FABRIC – Built with a reinforced FSC-certified hardwood frame, this sectional storage couch ensures long-lasting stability, strength, and shape retention. Upholstered in premium velvet fabric, it is soft, skin-friendly, and designed to be scratch-resistant, durable, and pet-friendly while helping conceal everyday marks and wear. Backed by a dedicated customer service team for reliable post-purchase support

Materials + Care

We prioritize quality in selecting the materials for our items, choosing premium fabrics and finishings that ensure durability, comfort, and timeless appeal.

Shipping + Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

You might also like...

Product title

Product title

$19.99
Sale price  $19.99 Regular price