Skip to product information
TOMU Genuine Leather Office Desk Chair, Ergonomic Leather Executive Office Chair, Upgraded Wood Grain Finish and S Curve Back with Solid Aluminum Frame, Luxury and Mordern
$1,483.35
Sale price
$1,483.35
Regular price
Shipping calculated at checkout.
Details
Product Details
- Brand: TOMU
- Color: Black & Wood
- Pattern: Solid
- Size: Large
- Item Dimensions: 26.37 x 34.64 x 48.81 inches
- Item Weight: 220 Pounds
- Maximum Weight Recommendation: 350 Pounds
- Included Components: Chair
- Unit Count: 1.0 Count
- Model Name: Zest Luxe Chair
- Model Number: T01 PRO
- Manufacturer: TOMU
- Form Factor: Executive Chair
- Shape: Ergonomic
- Theme: Modern
- Additional Features: Swivel Base
- Recommended Uses For Product: Office
- Room Type: Office
- Age Range Description: Adult
- Surface Recommendation: Hard Floor
- Indoor Outdoor Usage: Indoor
- Manufacturer Part Number: Y06
- Material Type: Leather
- Frame Material Type: Aluminum
- Product Care Instructions: Wipe Clean
- Seat Material: Leather
- Fill Material: Foam
- Furniture Base Movement: Swivel
- Reclining Position Count: 3
- Tilting: Yes
- Is Customizable?: No
- Is Foldable: No
- Number of Height Positions: 1
- Style Name: Modern
- Finish Types: Leather
- Arm Style: Padded
- Furniture Finish: Black
- Cushion Style: Padded
- Leg Style: Five-wheel Base
- Item Dimensions D x W x H: 26.37"D x 34.64"W x 48.81"H
- Seat Back Interior Height: 30 Inches
- Seat Height: 20 Inches
- Seat Depth: 18.11 inches
- Seat Length: 20.86 Inches
- Arm Height: 10 Inches
- Chair Backrest Width: 27.55 Inches
- Required Assembly: Yes
About this item
- 【Genuine Leather Office Chair Comfort】 Wrapped in high-grade genuine leather that is soft, durable, and ages beautifully. Naturally breathable surface keeps you cool and comfortable throughout the workday. The high-back design offers focused support without restricting movement.
- 【Mid-Century Modern Office Chair Aesthetic】 Where textures meet quietly — warm wood-grain meets rich top-grain leather. True to mid-century modern style, this chair lets natural materials speak without shouting. The subtle wood insert on the backrest adds organic warmth, balancing clean aluminum and genuine leather for a look that's understated, balanced, and timeless.
- 【Ergonomic Leather Office Chair High Back】 Precisely engineered spine-supporting curve gently cradles your mid-to-upper back, promoting healthy posture during long hours of sitting — ideal for home offices, reading nooks, or executive suites. Features a 130° recline function and 360° smooth swivel, allowing you to lean back comfortably during breaks and rotate effortlessly around your workspace.
- 【High End Office Chair Construction with 350 lbs Capacity】 Built with a sleek aluminum skeleton for exceptional strength and rust resistance — supports up to 350 lbs (158 kg) with confidence. High-back profile fits seamlessly into studies, living rooms, or offices while maintaining an open, uncluttered look.
- 【High Quality Office Chair with Compact Dimensions】 Overall size: 25.98" D × 24.80" W × 30.70" H (66 cm × 63 cm × 78 cm). Seat height adjusts from 16.92" to 20.86" (43–53 cm). Fits seamlessly into studies, living rooms, or offices. Assembly required (tools included). Imported.
Materials + Care
We prioritize quality in selecting the materials for our items, choosing premium fabrics and finishings that ensure durability, comfort, and timeless appeal.
Shipping + Returns
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.